ALBUQUERQUE, NM – DUB-L-EE, a highly successful construction company, is delighted to announce that they have recently completed an extensive and comprehensive project on budget and within the proposed time frame. This is a perfect demonstration of how efficient and reliable the company is, even during unprecedented challenges such as the COVID-19 pandemic. DUB-L-EE has proven, once again, that they are a problem-solving company that delivers on time and on budget.
The scope of work for this particular project involved the removal and disposal of half of the existing roadway pavement (centerline to shoulder above the new water line), the installation of approximately 6,400 linear feet of new Government-furnished 36-inch water main line including valves, fittings, and gaskets. The new 36-inch waterline was then connected to existing lines and pressure tested. The project also involved backfilling the existing trench, including an 8-inch base course, a 2-inch hot mix asphalt, followed by the milling and disposal of 2 inches of existing hot mix asphalt for the other half of the roadway. Ancillary work also included jacking and boring under existing crossing flood drainage lateral structures, a stormwater prevention plan, construction traffic control, and permanent pavement markings in accordance with the construction drawings and local and state traffic control standards. The project commenced in December 2018 and was completed in January 2021.
“This was a huge project which took significant time, resources, and planning to complete, but once again, the amazing team at DUB-L-EE stepped up to the plate and delivered,” said Eddie Saiz. “We continue to establish a reputation as a company that gets things done, professionally and on schedule, and we look forward to more exciting projects in the future.”
DUB-L-EE Construction a minority-owned and operated family business, is New Mexico’s fastest-growing company, with exponential growth since opening their doors in 2012. Their professional, knowledgeable and experienced team members are at the heart of their success, as well as their ability to deliver exceptional service. Led by Eddie Sr. and Eddie Jr. Saiz (the EE in Dub-L-EE), a father and son team with extensive experience in the natural gas, plumbing, HVAC, and construction business, the Dub-L-EE team is second to none in its commitment to excellence. For more information about the company and the services they provide, visit their website at https://www.dub-l-ee.com.
Eddie has been a resident of Albuquerque his entire life.
After he graduated from high school, Eddie joined the Plumbers & Pipefitters Union where he obtained his Journeyman Plumber and Journeyman Gas Certifications. He then worked in the commercial plumbing industry for 7 years until he and his father decided to go into business together and started Dub-L-EE, LLC.
In the last 7 years Eddie has obtained his GA02, GA03, and MM98 certifications allowing Dub-L-EE to fully utilize Eddie Sr. and Eddie Jr.’s expertise in the construction industry.